industralisation & optimisation in photovoltaic power plants
Process Process Process Process Process
Some advantages of a two phases workflow for industrialising and optimising processes in Photovoltaic power plants
- The main objective is to minimise delays in the planning of the installation of photovoltaic plants.
- We use problem solving analysis to anticipate potential errors during assembly process.
- Provide an «assembly manual» to our customers to tackle multiple projects with the same standard of work. In short, all the Photovoltaic plants will be assembled using the same methodology.
- Transfer of knowledge to the client's internal project team so that they are able to maintain, replicate and improve the defined work standard.

Phase 1:
Analysis & Diagnosis
-
Technical
- Analysing the entire assembly process
- From the beginning (design) to the end of the work
- Technical analysis & lean methodology
- Field measurements
- Propose and implement improvement actions
- Preparation of standard and industrialisation documents
-
Organisational
- Determine process control KPIs
- Define the pyramid of daily/weekly/monthly management meetings
- Determine Go/no Go and key control points
-
Human Resources
- Training corporate experts
- Knowledge transfer and mentoring
Phase 2:
Implementation
Technical
- Implementation of the practices defined in the industrialisation of the process
- Validation of improvements
Organisational
- Auditing the correct implementation of actions
- Accompanying in the daily/weekly/monthly
- Management meetings
Human resources
- Staff training
- Knowledge transfer and accompaniment

Results
The results of the projects carried out by Optimus Crane generate a series of economic savings in two ways:
- Reduction of the assembly time of the photovoltaic plants based on the minimisation/elimination of planning delays.
- Reduction of operating costs by having an optimised standard of resources and time allocated to the different tasks.